Case Study

Manufacturing Client

Case Study:

Manufacturing Client

Temporary Cooling Solution

The Issue

Following a breakdown on one circuit (50%) of the existing Chiller this seriously reduced the clients manufacturing output and hence had a knock on effect of slowed down production, delayed deliveries and a loss of revenue and profit.

The Solution

A site survey resulted in recommending a 260kW Chiller unit located in the storage yard. The hired Chiller was connected into the existing Chilled Water ring main circuit in the factory to cool the plastics manufacturing machines.


As an additional insurance remote monitoring was provided with the hire Chiller along with 24/7 back up by our Service Dept. to ensure business continuity for the client.